View Requests - 6,537 found

Road Repair at 6753 130 AV SE

Twin the road
CLOSED No Action Required - Close SR - 11 days ago #18-00032480

Road Repair at 12445 LAKE FRASER DR Lake Bonavista

There is an ever growing Pot Hole, already abouy 1' long, just in the far right hand lane, Macleod Trail south (and , by the Avenida Shopping centre (about 20 seconds before the turn off onto Anderson.
OPENED 11 days ago #18-00032841

Road Repair at 2181 50 Ave SE Southeast Calgary

road over train tracks has become heavily uneven and warped. Many large trucks/semi's pass over it daily.
CLOSED No Action Required - Close SR - 11 days ago #18-00021198

Road Repair at 830 9 AV SW

The North lane on 9ave @7street S.W. has been closed for 3 months. It seems like there?s not much going on during the week. I?ve driven by on weekends and no work at all. This is an important road for many, it?s annoyingly slow pace.
CLOSED Issue Resolved - Close SR. This is an Enmax worksite. When they are finished they will open up the lane and the cycle track on 5th. Thank you for your patience, and drive with care. - 13 days ago #18-00020938
Road Repair at 830 9 AV SW

Road Repair at 4106 16 AV NW

Multiple deep potholes when large 2 inch pieces of asphalt are missing.
OPENED 13 days ago #18-00020833

Road Repair at 1720 HIDDEN CREEK WY NW

Drainage ditch needs repair
CLOSED Issue Resolved - Close SR. Home owners responsibility to ensure drainage. There is free pea gravel supplied at fire hall for safety. - 14 days ago #18-00020116
Road Repair at 1720 HIDDEN CREEK WY NW

Road Repair at 617 9 AV NE

Lane repair from gas line connection substandard. Lip will create drainage issues in laneway and quality of paving poor.
CLOSED Completed - Close SR. Patch may be 1/2 inch to high, this type of work generally settles a little lower during the spring thaw.. Issue is a non issue to all properties to the west as the water flows to the west. Location will have to be observed during the spring to check for settling or any potential minor drainage issues. - 14 days ago #18-00017310
Road Repair at 617 9 AV NE

Road Repair at 2009 90 AV SW

Pavement patch job that went in over the ATCO pipeline install is unacceptable. This has to be the bumpiest patch job I have ever driven over. This needs to be scraped up and refinished. Unacceptable that this was not returned in as go...
CLOSED Duplicate File - Close SR. This is a duplicate SR; original is 17-01204121. - 14 days ago #17-01232126
Road Repair at 2009 90 AV SW

Road Repair at 2175 50 AV SE

Extremely large bump at train tracks
CLOSED No Action Required - Close SR. Seasonal distortion (and distortion), bump signs in place. Railway crossing are to be approached with caution at all times. Future repairs (2018, or later) may occur during construction season which will be coordinated with the rail line steward. - 19 days ago #17-01278528

Road Repair at 7803 CHURCHILL DR SW

Island not centred in roadway. As a result, the southbound lane on Churchill Rd is far too narrow. When the fellow on the end of Churchill parks in front of his house there's almost no room for traffic to pass by
CLOSED No Action Required - Close SR. No Roads issues. - about 1 month ago #17-01261664
Road Repair at 7803 CHURCHILL DR SW
Web_branding_watermark

Your city anywhere, anytime!

311 Calgary is your on the go connection to The City. Report and track select City services via your smart phone using location based technology with the option to include a photo of the concern.

Start Reporting

  • Android_market
  • App_store

Status

Services