View Requests - 5,920 found

Snow on Road at 14 St SW Calgary Division No. 6

Roads are extremely icy and treacherous.
CLOSED Move to 7 Day SNIC Plan - 17 days ago #18-00296618

Snow on Road at 122 DOVERCLIFFE CL SE

Snow ruts at alley
CLOSED Move to 7 Day SNIC Plan. Thank you for your Service Request. Please know that we are currently working through our 7 Day plan and this location will be addressed through our 7 day snow plan. Priority System; * Day 1 - We start on the high volume roads, called Priority 1s, in order to keep the greatest number of Calgarians travelling safely. Priority 1 roads, such as Crowchild and Glenmore Trail, carry more than 20,000 vehicles per day, and are plowed, sanded and salted by the end of the first 24 hours once the snow stops falling. Please note this is a straight through pass on all priority ones, not including turning lanes nor bus lay-bys, these are done on Day 3. Steps and Walks are also included in our Day 1 SNIC Plan and these areas have been determined by City Council please visit Calgary.ca to learn more about prioritized areas for snow clearing; * Day 2 - Up next are the Priority 2 roads which are plowed, sanded and salted within 48 hours after the snow has stopped. Priority 2 routes are roads which typically carry 5,000 to 19,999 vehicles per day. These area's included many Transit bus routes, Roadways with marked, on-street bike lanes, designated emergency routes and any other problem areas; * Days 3-6 - On day three, we move into the residential areas as well as designated feeder collector routes that run in and out of communities. Residential roads with school and playground zones, hills and intersections are considered a Priority 3, while the remaining residential roads that have the lowest traffic volumes are considered to be a Priority 4; City crews maintain residential roads on days three through six by sanding, salting and flat-blading. Under our plan, plows will knock down ruts to 12cms, but will not remove snow from residential streets; * Day 7 - On the last day of the Seven Day Plan, crews will monitor the roads and respond to service requests for additional snow and ice control and get ready to do it all over again. Roads will also handle any other areas that they will identify that need snow removal action required. - 17 days ago #18-00293030
Snow on Road at 122 DOVERCLIFFE CL SE

Snow on Road at 6223 CROWCHILD TR SW

(redacted)
CLOSED Move to 7 Day SNIC Plan. on bobcats list. - 17 days ago #18-00296097

Snow on Road at 2016 5 ST NW

City dumped snow on the road residents cannot park anymore. There is an older couple lives right on the corner and their pathway is not accesssible anymore as its blocked by snow and ice now.
CLOSED Move to 7 Day SNIC Plan. We will plow snow/ice when possible. - 17 days ago #18-00292671

Snow on Road at 4736 NIPAWIN CR NW

Back lane way is so rutted it is impassable. Cars are high centred on the ruts.
CLOSED Move to 7 Day SNIC Plan. We will plow snow/ice when possible. - 17 days ago #18-00296851

Snow on Road at 7044 15 AV SE

Snow on road
CLOSED Move to 7 Day SNIC Plan. Thank you for your Service Request. Please know that we are currently working through our 7 Day plan and this location will be addressed through our 7 day snow plan. Priority System; * Day 1 - We start on the high volume roads, called Priority 1s, in order to keep the greatest number of Calgarians travelling safely. Priority 1 roads, such as Crowchild and Glenmore Trail, carry more than 20,000 vehicles per day, and are plowed, sanded and salted by the end of the first 24 hours once the snow stops falling. Please note this is a straight through pass on all priority ones, not including turning lanes nor bus lay-bys, these are done on Day 3. Steps and Walks are also included in our Day 1 SNIC Plan and these areas have been determined by City Council please visit Calgary.ca to learn more about prioritized areas for snow clearing; * Day 2 - Up next are the Priority 2 roads which are plowed, sanded and salted within 48 hours after the snow has stopped. Priority 2 routes are roads which typically carry 5,000 to 19,999 vehicles per day. These area's included many Transit bus routes, Roadways with marked, on-street bike lanes, designated emergency routes and any other problem areas; * Days 3-6 - On day three, we move into the residential areas as well as designated feeder collector routes that run in and out of communities. Residential roads with school and playground zones, hills and intersections are considered a Priority 3, while the remaining residential roads that have the lowest traffic volumes are considered to be a Priority 4; City crews maintain residential roads on days three through six by sanding, salting and flat-blading. Under our plan, plows will knock down ruts to 12cms, but will not remove snow from residential streets; * Day 7 - On the last day of the Seven Day Plan, crews will monitor the roads and respond to service requests for additional snow and ice control and get ready to do it all over again. Roads will also handle any other areas that they will identify that need snow removal action required. - 17 days ago #18-00292231
Snow on Road at 7044 15 AV SE

Snow on Road at 5519 DALRYMPLE HL NW

We've had a thick layer of snow and ices blocking the road for over a week now. My wife made a request on Sunday but nothing is done yet. I am also hoping someone can install a storm water draincas the 9 inch thick snow pack damaged my ca...
CLOSED Move to 7 Day SNIC Plan - 17 days ago #18-00293596
Snow on Road at 5519 DALRYMPLE HL NW

Snow on Road at 32 Deercross Pl SE Southeast Calgary

The road on Deercross Place and Deercross Way is so deeply rutted from snow and ice that onbly trucks and SUV's can drive in. We are having to park our cars a block or two away and walk in
CLOSED Move to 7 Day SNIC Plan. Printed and on the list. - 18 days ago #18-00292437

Snow on Road at 9607 PALISAN PL SW

Many vehicles are getting stuck in the cul-de-sac
CLOSED 18 days ago #18-00292613

Snow on Road at 24 BROOKPARK RI SW

Ice on road has turned into a massive puddle making it impossible to travel throug. We have had a number of cars stuck today
CLOSED Move to 7 Day SNIC Plan. Printed and on the list. - see if grader can pull snow towards the park. - 18 days ago #18-00292161
Snow on Road at 24 BROOKPARK RI SW
Web_branding_watermark

Your city anywhere, anytime!

311 Calgary is your on the go connection to The City. Report and track select City services via your smart phone using location based technology with the option to include a photo of the concern.

Start Reporting

  • Android_market
  • App_store

Status

Services