Backlane Maintenance at 8623 34 Av NW
Several large potholes collecting a lot of water
OPENED
Move to Future Out of Season Backlane Maint List. JA - The ONLY way to eliminate ongoing pothole / mud/ pooling/ rutting issues in gravel lanes is by having the lane paved via local Improvements. This HAS to be initiated by an adjacent property owner (maybe caller) by petition. Info is available on the Calgary.ca website. This has been added to our annual lane program, this starts after we have completed SCU, approx. end of June. Please watch for signs and make sure no obstacles (Vehicles, Trailers, Bins, Etc.) are in way of graders. -
about 1 month ago
#25-00146919
|
|
Backlane Maintenance at 8619 34 Av NW
Back alley rut / dip causing water and ice issues.
OPENED
about 1 month ago
#25-00147201
|
|
Backlane Maintenance at 8619 34 Av NW
Alley has big dip and quite a few potholes. Creating a huge pond outside my garage
OPENED
about 1 month ago
#25-00147187
|
|
Backlane Maintenance at 705 52 Av SW
The storm drain in the alley behind 705 52nd Ave SW is clogged and the melt will flood into our garage on the next day or so.
OPENED
Field Inspection Required -
about 1 month ago
#25-00122084
|
|
Backlane Maintenance at 44 Klamath Pl SW Southwest Calgary
muddy back lane behind garage. needs some gravel?
OPENED
Will be Addressed in Backlane Program -
about 1 month ago
#25-00140367
|
|
|
Backlane Maintenance at 3832 16 St SE
Back lane needs graded and new gravel
OPENED
Will be Addressed in Backlane Program. Mar 1 - All gravel back lanes will be addressed in the 2025 Summer Gravel Lane Program, tentatively scheduled for June. - JT. -
about 1 month ago
#25-00140887
|
|
Backlane Maintenance at 8816 47 Av NW
Need gravel for low spot This is a safety hazard as many people have slipped and fallen, including myself
OPENED
Move to Future Out of Season Backlane Maint List. JA - The ONLY way to eliminate ongoing pothole / mud/ pooling/ rutting issues in gravel lanes is by having the lane paved via local Improvements. This HAS to be initiated by an adjacent property owner (maybe caller) by petition. Info is available on the Calgary.ca website. This has been added to our annual lane program, this starts after we have completed SCU, approx. end of June. Please watch for signs and make sure no obstacles (Vehicles, Trailers, Bins, Etc.) are in way of graders. -
about 1 month ago
#25-00138773
|
|
Backlane Maintenance at 3719 Sarcee Rd SW Rutland Park
Alley not draining. This is second request. Now there is a mess.
OPENED
Move to Future Out of Season Backlane Maint List. We will try to attend to lane prior to 2025 Lane Program. Lane must be dry for us to work on it therefore it can be affected by weather and is dependent on men and equipment availability. If not, it will be done during lane program this summer. We encourage citizens to contact 311 and get information about paving of lanes as part of the Local Improvement. -
about 1 month ago
#25-00139425
|
|
Backlane Maintenance at 6379 33 Av NW
Puddle due to poor grading in laneway
OPENED
Move to Future Out of Season Backlane Maint List. JA - The ONLY way to eliminate ongoing pothole / mud/ pooling/ rutting issues in gravel lanes is by having the lane paved via local Improvements. This HAS to be initiated by an adjacent property owner (maybe caller) by petition. Info is available on the Calgary.ca website. This has been added to our annual lane program, this starts after we have completed SCU, approx. end of June. Please watch for signs and make sure no obstacles (Vehicles, Trailers, Bins Etc.) are in way of graders. -
about 1 month ago
#25-00135614
|
|
Backlane Maintenance at 204 Silver Crest Dr NW
Level of alley below sidewalk, needs regrading
OPENED
Move to Future Out of Season Backlane Maint List. JA - The ONLY way to eliminate ongoing pothole / mud/ pooling/ rutting issues in gravel lanes is by having the lane paved via local Improvements. This HAS to be initiated by an adjacent property owner (maybe caller) by petition. Info is available on the Calgary.ca website. This has been added to our annual lane program, this starts after we have completed SCU, approx. end of June. Please watch for signs and make sure no obstacles (Vehicles, Trailers, Bins Etc.) are in way of graders. -
about 1 month ago
#25-00134649
|
|