View Requests - 1,023 found

Backlane Maintenance at 1235 20 Av NW

Standing water not draining. It has turned into a mud lane from construction. Gavels are no longer visible.
OPENED about 1 month ago #25-00230092
Backlane Maintenance at 1235 20 Av NW

Backlane Maintenance at 37 Masters Cr SE

Back lane gravel is horrible! Massive holes everywhere, needs to be graded and graveled
OPENED about 1 month ago #25-00229939

Backlane Maintenance at 2807 4 Av Nw, Calgary, Ab T2 N0 R2

Multiple ruts in backlane.
OPENED Will be Addressed in Backlane Program - about 1 month ago #25-00227361
Backlane Maintenance at 2807 4 Av Nw, Calgary, Ab T2 N0 R2

Backlane Maintenance at 308 Falwood Wy NE

Very large pot holes all down the ally
OPENED Move to Future Gravel Road Work List. April6-2025 QK- Moved to future gravel road work list. - about 1 month ago #25-00221710

Backlane Maintenance at 140 Martinwood Pl NE Martindale

Backland needs gravel
OPENED Will be Addressed in Backlane Program. April 6-2025 QK- It will be addressed in Backlane program. - about 1 month ago #25-00219831

Backlane Maintenance at 923 Robert Rd NE

Back lane is muddy and full of ruts some are big enough to be a pond
OPENED Will be Addressed in Backlane Program - about 1 month ago #25-00223631
Backlane Maintenance at 923 Robert Rd NE

Backlane Maintenance at 1308 Colgrove Av NE

OPENED Will be Addressed in Backlane Program - about 1 month ago #25-00224951
Backlane Maintenance at 1308 Colgrove Av NE

Backlane Maintenance at 235 11 St NE

Big indentations in the alley. Water pools up. Behind 235 11 St NE
OPENED Will be Addressed in Backlane Program - about 1 month ago #25-00221261
Backlane Maintenance at 235 11 St NE

Backlane Maintenance at 2816 14 St NW

OPENED about 1 month ago #25-00220813
Backlane Maintenance at 2816 14 St NW

Backlane Maintenance at 6131 Bowness Rd Nw, Calgary, Ab T3 B0 C9

The back lane behind 6131 bowness road is full of potholes.
OPENED Will be Addressed in Backlane Program. JG - 2025-04-02 - All back lanes are inspected during the annual lane program. Gravel Lane Program runs from late June to late September. If your lane does not get graded this year, it will be reassessed for possible lane grading during next year's lane program. Please see online schedule https://www.calgary.ca/roads/maintenance/gravel-lane-repair.htmlThe ONLY way to eliminate these ongoing pothole/mud/rut/dust issues in lanes is by having the lane paved via local Improvements. This is REQUIRED to be initiated by an adjacent property owner(s) (maybe caller) by petition. Info is available on the Calgary.ca website. (https://www.calgary.ca/roads/local-improvements.html). - about 1 month ago #25-00215750
Backlane Maintenance at 6131 Bowness Rd Nw, Calgary, Ab T3 B0 C9
Web_branding_watermark

Your city anywhere, anytime!

311 Calgary is your on the go connection to The City. Report and track select City services via your smart phone using location based technology with the option to include a photo of the concern.

Start Reporting

  • Android_market
  • App_store

Status

Services