Sidewalk or Curb - Repair at 73 Aberdare Rd NE
Very difficult to cross with a stroller
Nature of Concern: ONGCONCO
Type of Sidewalk: Asphalt
Specific Details: Pathway is unfinished at the train tracks behind Abbeydale. All other areas of the pathway is completed behind Abbeydale and Applewood Very difficult to cross with a stroller
Specific Location: Pathway behind Abbeydale at the train track crossing along Stoney Trail
address: 73 ABERDARE RD NE, CALGARY, T2A6V8
coordinates x,y: 5455.693596498036, 5657698.0806890065
coordinates lat,lng: 51.05550893433082, -113.9221803269448
ward: 10
Timestamp | Description |
---|---|
Mon Sep 25, 2017 09:45am | Closed with status: Issue Resolved - Close SR. Location belongs to CN rail. |
Mon Sep 25, 2017 09:44am | Field Inspection >> Issue Resolved - Close SR |
Fri Sep 22, 2017 05:25pm | Opened |
Fri Sep 22, 2017 05:24pm | Submitted via iPhone |