Road Repair at 2009 90 Av SW
Pavement patch job that went in over the ATCO pipeline install is unacceptable. This has to be the bumpiest patch job I have ever driven over. This needs to be scraped up and refinished. Unacceptable that this was not returned in as good or better shape before the pipeline installation.
Issue: Uneven Surface / Cracks
Specific location details: All along 90th ave west bound between 14th St and 24th St.
Type of Road: BUROM001
address: 2009 90 AV SW
coordinates x,y: -7560.357244223305, 5648441.088333814
coordinates lat,lng: 50.97226690795313, -114.1076475834065
ward: 11
Timestamp | Description |
---|---|
Sun Jan 07, 2018 09:24am | Closed with status: Duplicate File - Close SR. This is a duplicate SR; original is 17-01204121. |
Sun Jan 07, 2018 09:23am | Field Inspection >> Duplicate File - Close SR |
Tue Dec 12, 2017 10:48am | SR Review >> Field Inspection Required |
Tue Dec 12, 2017 09:37am | Opened |
Tue Dec 12, 2017 09:35am | Submitted via iPhone |