Road Repair at 302 12 Av SW

CLOSED Issue Resolved - Close SR. 2018/06/15 - TT - We attended the site and observed that the fence is there for the safety of the public. The developer is currently working on the forms for the curb gutter (new sidewalks), so we anticipate the fence will be moved back closer to the property line within about a week. We moved the fence as close to the excavation as possible; We also noticed several low spots / hazards in the cycle track and are pursuing the repairs to be done by Enmax (2017 utility cut in the bike lane). - almost 6 years ago #18-00581229
Report
Submitted Thu Jun 14, 2018

Fence is on road again - narrowing the track to little more than a single lane for two way traffic. Additionally pavement is in horrific condition - several sections have sunk quite noticeably since removal of the protected walkway/cover

Issue: SICAI002

Specific location details: Cycle track on 12th Ave along the Park Point construction site



address: 302 12 AV SW

coordinates x,y: -4800.826193059741, 5656161.961768691

coordinates lat,lng: 51.0417055, -114.0684583333333

ward: 11

Timestamp Description
Fri Jun 15, 2018 01:41pm Closed with status: Issue Resolved - Close SR. 2018/06/15 - TT - We attended the site and observed that the fence is there for the safety of the public. The developer is currently working on the forms for the curb gutter (new sidewalks), so we anticipate the fence will be moved back closer to the property line within about a week. We moved the fence as close to the excavation as possible; We also noticed several low spots / hazards in the cycle track and are pursuing the repairs to be done by Enmax (2017 utility cut in the bike lane).
Fri Jun 15, 2018 01:41pm Field Inspection >> Issue Resolved - Close SR
Fri Jun 15, 2018 09:16am SR Review >> Field Inspection Required
Thu Jun 14, 2018 08:21pm Opened
Thu Jun 14, 2018 08:21pm Submitted via iPhone Iphone