Sidewalk or Curb - Repair at 4514 8 Av SW
Temporary asphalt sidewalk sections are uneven and are a tripping hazard. Needs to be replaced with concrete to match the existing cement sidewalk.
Nature of Concern: Heaving / Sinking Sidewalk
Type of Sidewalk: Asphalt
Specific Details: Temporary asphalt sections from construction are uneven and pose tripping concern. Need to be replaced with cement to match existing side walk.
Specific Location: 4512 / 4514 8 Ave SW
address: 4514 8 AV SW
coordinates x,y: -10658.611204593499, 5656557.908294507
coordinates lat,lng: 51.04518616666667, -114.152
ward: 8
Timestamp | Description |
---|---|
Tue Mar 26, 2019 09:44am | Closed with status: No Action Required - Close SR. Permit: Sidewalk is on list for replacement in 2019, Sidewalk was inspected and temporary asphalt repair has been made until concrete can be replaced. Concrete season run June to Nov; our schedule changes too often due to weather we cannot give fixed date. Please Note; Due to high volume of permits; replacement maybe delayed until 2020 season. Sidewalk is not a hazard. Sorry for any inconvenience. |
Tue Mar 26, 2019 09:44am | Field Inspection >> No Action Required - Close SR |
Mon Mar 25, 2019 06:06pm | Opened |
Mon Mar 25, 2019 06:03pm | Submitted via iPhone |