Backlane Maintenance at 1432 2 A St NW

CLOSED No Action Required - Close SR. February 3rd, 2020 - TA; All back lanes will be reassessed for possible maintenance during Roads' annual back lane maintenance program. Roads does not complete maintenance in back lanes over the winter season. - about 4 years ago #20-00088396
Photo_20200201_201111
Submitted Sat Feb 01, 2020

Backlane in front of our garage

Issue: Gravel

Specific details of the issue: We have a 30ft section of backlane in front of our garage that is now a pool. This section is at least 8-10 inches below grade and is never repaired. During annual maintenance, gravel is dumped and within hours, the section is back to being lower in grade which leads to immediate pooling during rain or snow melts. I have been asking 2-3x per year for 3 years to have this properly repaired. I am constantly told it will get done during regular maintenance scheduling yet it is never repaired right.

Specific Location details: Between 13ac and 16ave, backlane of 2a st

Type of Backlane: Gravel Backlane



address: 1432 2A ST NW

coordinates x,y: -4793.041878519883, 5658811.405116449

coordinates lat,lng: 51.0655233, -114.0683824

ward: 7

Timestamp Description
Mon Feb 03, 2020 08:18am Closed with status: No Action Required - Close SR. February 3rd, 2020 - TA; All back lanes will be reassessed for possible maintenance during Roads' annual back lane maintenance program. Roads does not complete maintenance in back lanes over the winter season.
Mon Feb 03, 2020 08:17am Field Inspection >> No Action Required - Close SR
Sat Feb 01, 2020 08:13pm Opened
Sat Feb 01, 2020 08:13pm Submitted via Android Android