View Requests - 1,031 found
Backlane Maintenance at 811 78 Av NW
Severe ruts in back lane- - again.
OPENED
2 months ago
#24-00726692
|
|
Backlane Maintenance at 1301 5 St NE
Alley way deep ruts. No drainage.
OPENED
2 months ago
#24-00724102
|
|
Backlane Maintenance at 39 Cambridge Rd NW
Numerous and large pot holes.
OPENED
Will be Addressed in Backlane Program -
2 months ago
#24-00723219
|
|
|
Backlane Maintenance at 67 Hudson Rd NW
Alley is in very bad condition
OPENED
Will be Addressed in Backlane Program. JA SEPT 12/24This will be addressed in our backlane program. -
2 months ago
#24-00721178
|
|
|
Backlane Maintenance at 4008 Grove Hill Rd SW
OPENED
Move to Future Out of Season SCU List. Sweep at lane entrance. -
2 months ago
#23-00521344
|
|
Backlane Maintenance at 71 Hudson Rd NW
Alley in terrible shape
OPENED
2 months ago
#24-00721182
|
|
|
Backlane Maintenance at 523 26 Ave NW
Back alley in need of maintenance! Full of pothouse.
OPENED
2 months ago
#24-00720222
|
|
|
Backlane Maintenance at 111 Beaconsfield Ri NW
Alley has large washed out areas due to heavy rain over last month. Front of alley someone dumped large mounds of sand but never filled anything properly. Cars had to drive over mounds as big as speed bumps. Sand will just be washed on...
OPENED
Will be Addressed in Backlane Program. JG - 2024-09-11 - Lane was inspected and placed on Future Lane Grader Maintenance List for the Gravel Lane. Gravel Lane Program runs from late June to late September. Due to Water Emergency Gravel Lane Program is behind schedule. Please see online schedule https://www.calgary.ca/roads/maintenance/gravel-lane-repair.htmlThe ONLY way to eliminate these ongoing pothole/mud/rut/dust issues in lanes is by having the lane paved via local Improvements. This is REQUIRED to be initiated by an adjacent property owner(s) (maybe caller) by petition. Info is available on the Calgary.ca website. (https://www.calgary.ca/roads/local-improvements.html). -
2 months ago
#24-00718145
|
|
Backlane Maintenance at 406 18 Av NW
Need more Gravel
OPENED
Will be Addressed in Backlane Program. JA SEPT 11/24This alley could be delayed due to new home construction. -
2 months ago
#24-00718346
|
|
Backlane Maintenance at 1301 Regal Crescent NE Renfrew
Lane recently graded & graveled, there is still a low spot behind 1301 Regal Cr NE as seen in photo.
OPENED
2 months ago
#24-00718305
|
|