Road Repair at 2009 43 Av SW
There was road work that was being done on 43 Ave SW approximately 4-5 weeks where the road was excavated. Haven't seen a worker around since and this is what we have to drive over everyday. And when it's raining or snowing this hole becomes a muddy mess. What is being done to complete this work? Can the city lay some gravel in the meantime? This is quite unacceptable that we must endure this type of road disrepair for this length of time.
Issue: Uneven Surface / Cracks
Specific details of the issue: See the photos attached to gain more details. This repair was started weeks ago and left like this for all the nearby residents to drive over. It's dangerous on so many levels to leave such a large gaping hole on a residential street.
Specific location details: 43 Ave SW near 19 Street SW.
Type of Road: Paved Public Road
address: 2009 43 AV SW
coordinates x,y: -7484.578000917348, 5653201.5950050745
coordinates lat,lng: 51.01506388333333, -114.1066666666667
ward: 8
Timestamp | Description |
---|---|
Tue Apr 16, 2024 12:11pm | Closed |
Mon Apr 15, 2024 07:53pm | Opened |
Mon Apr 15, 2024 07:52pm | Submitted via iPhone |