Road Repair at 1961 40 Av SW
The transition from apron to the alley is not correct for all four units. There was a gap but concrete contractor filled it and mentioned the city would asphalt to make it look even and straight. The concrete is now cracking and eventually there will be a hole. Asphalt needs to be laid and the transition needs to be straight. Thanks
Issue: Uneven Surface / Cracks
Specific details of the issue: The transition from apron to the alley is not correct for all four units. There was a gap but concrete contractor filled it and mentioned the city would asphalt to make it look even and straight. The concrete is now cracking and eventually there will be a hole. Asphalt needs to be laid and the transition needs to be straight. Thanks
Specific location details: Back alley between 19 st and 18 st. Garages for 1963, 1965 and 1967. Fourplex.
Type of Road: Paved Public Road
address: 1961 40 AV SW
coordinates x,y: -7416.181744018254, 5653527.332876136
coordinates lat,lng: 51.01799307477406, -114.1056985743572
ward: 8
Timestamp | Description |
---|---|
Wed Oct 16, 2024 10:34am | Closed |
Tue Oct 08, 2024 11:44am | Opened |
Tue Oct 08, 2024 11:42am | Submitted via iPhone |