Road Repair at 1166 Copperfield Bv SE

CLOSED 26 days ago #24-00825665
Report
Submitted Thu Oct 24, 2024

Around three weeks ago, there was construction in front of my house where the road was cut on the side. The area where the cut was made has not been filled or repaired since then, leaving an unfinished and uneven surface. This has happened twice now. Two days ago, they moved the sign marking the road cut and placed it on the grass, where they also made a cut but did not repair it either. With winter approaching, I am requesting that both areas be filled and repaired before the snow arrives to ensure safety for vehicles and pedestrians.

Issue: Uneven Surface / Cracks

Specific details of the issue: Around three weeks ago, there was construction in front of my house where the road was cut on the side. The area where the cut was made has not been filled or repaired since then, leaving an unfinished and uneven surface. This has happened twice now. Two days ago, they moved the sign marking the road cut and placed it on the grass, where they also made a cut but did not repair it either. With winter approaching, I am requesting that both areas be filled and repaired before the snow arrives to ensure safety for vehicles and pedestrians.

Specific location details: 1166 -1170-1174-1178 copperfield blvd se Calgary

Type of Road: Paved Public Road



address: 1166 COPPERFIELD BV SE

coordinates x,y: 5174.828144182644, 5641766.7416193085

coordinates lat,lng: 50.91229166666669, -113.9264133333334

ward: 12

Timestamp Description
Sun Oct 27, 2024 08:24am Closed
Thu Oct 24, 2024 02:04pm Opened
Thu Oct 24, 2024 02:02pm Submitted via iPhone Iphone