Road Repair at 1166 Copperfield Bv SE
Around three weeks ago, there was construction in front of my house where the road was cut on the side. The area where the cut was made has not been filled or repaired since then, leaving an unfinished and uneven surface. This has happened twice now. Two days ago, they moved the sign marking the road cut and placed it on the grass, where they also made a cut but did not repair it either. With winter approaching, I am requesting that both areas be filled and repaired before the snow arrives to ensure safety for vehicles and pedestrians.
Issue: Uneven Surface / Cracks
Specific details of the issue: Around three weeks ago, there was construction in front of my house where the road was cut on the side. The area where the cut was made has not been filled or repaired since then, leaving an unfinished and uneven surface. This has happened twice now. Two days ago, they moved the sign marking the road cut and placed it on the grass, where they also made a cut but did not repair it either. With winter approaching, I am requesting that both areas be filled and repaired before the snow arrives to ensure safety for vehicles and pedestrians.
Specific location details: 1166 -1170-1174-1178 copperfield blvd se Calgary
Type of Road: Paved Public Road
address: 1166 COPPERFIELD BV SE
coordinates x,y: 5174.828144182644, 5641766.7416193085
coordinates lat,lng: 50.91229166666669, -113.9264133333334
ward: 12
Timestamp | Description |
---|---|
Sun Oct 27, 2024 08:24am | Closed |
Thu Oct 24, 2024 02:04pm | Opened |
Thu Oct 24, 2024 02:02pm | Submitted via iPhone |